New Bulk 3D
Opportunity

New Oil Terminal

Connect With Us Today

Unlock premier destinations for investment and development in the heart of Aqaba's thriving coastline.

The New Oil Terminal project aims to expand Aqaba's oil handling capacity and relieve pressure on existing facilities by supporting current operations while enabling a broader range of liquid commodities, including petroleum products and emerging industrial liquids like ammonia. Utilizing a single large berth located south of the existing oil berth, the terminal leverages Aqaba’s established infrastructure to optimize port operations, support sustainable industrial growth, and ensure Jordan’s long-term competitiveness in energy trade. 

ADC will deliver the marine works under an EPC contract, and an operator will equip and operate the terminal under an Equip, Operate and Transfer (EOT) arrangement, with both being procured through parallel tenders.

Project Brief and Investment Highlights at a Glance.
Status
Ready to Invest
Cluster
Transport & Logistics

Investment Type
Build-Operate-Transfer
Premium Amenities and Strategic Advantages of our Venue
Image
New Bulk

Single large berth

Location

New Oil Terminal
King Hussein Intl. Airport
35 MIN
City Center
25 MIN
Queen Alia Intl. Airport
3 HR 45 MIN
Aqaba Port
10 MIN
Ayla Marina
30 MIN
Wadi Rum
1 HR 20 MIN
Continue Exploring the Transport & Logistics
 Cluster.
Image
New Silica
SVG
Transport & Logistics


New Silica and Dry Bulk Terminal

Strategically located along the Gulf of Aqaba at Aqaba Middle Port, the Aqaba Development Corporation (ADC) is set to...

Find Answers to the Most Common Questions About this Opportunity.

What is the procurement and delivery model for the project?

ADC will deliver the marine works under an EPC (Engineering, Procurement, and Construction) contract, and an operator will equip and operate the terminal under an EOT (Equip, Operate, and Transfer) arrangement. Both components are being procured through parallel tenders.

What is the capacity of the terminal?

The terminal can handle 5 million tonnes per year, which raises Aqaba's overall oil handling capacity to 11 million tonnes per year.

What is the location of the New Oil Terminal?

The terminal will utilize a single large berth located south of the existing oil berth, leveraging Aqaba’s established port infrastructure and connectivity.

Explore the Transport & Logistics
 Cluster

Discover the sector behind this investment opportunity, including its strategic advantages, market potential, key assets, and future growth opportunities.